Design Guidelines for the Richmond H-1 Overlay, Madison County, Kentucky

March 8, 2007

Design GuidelinesDear Mr. Evans, Brandon, Rita, and Board,

downloadClick here to download the March 6/FINAL revision of the Design Guidelines

This revision is based on input that came out of the training seminar Friday, March 2. There are highlights where I've made changes. Brandon has reviewed these.

1. Changed Table of Contents:

  • number 1.4 is now "Architectural Details & Siding"

2. Changed page 25:

  • added note in introductory paragraph
  • added number 1.4.5

3. Changed number 1.5.3 on page 26.

4. Changed wording on page 42: "When evaluating proposals, the BAR will give special consideration to the following:"

5. Changed wording in number 3.3.11, page 43.

 

March 1 , 2007

Dear Mr. Evans, Rita, Brandon, and board members,

Thank you all for your comments and suggestions on the Guidelines. We have finished preparing a "final" draft for your review. The link to it is here:

downloadDesign Guidelines for the Richmond H-1 Overlay (Feb 28)

We will bring enough hard copies for everyone tomorrow.

We look forward to seeing you all tomorrow at the seminar.

Fred and Glen

SEMINAR : EFFECTIVE DESIGN REVIEW IN RICHMOND
Date Friday, March 2, 2007
Place Richmond, KY, City Hall
Time 9am - 4pm
GOAL To prepare commission members (and others) to implement effective design review practices and procedures.
AGENDA
9:00—9:15 Welcome and Introductions (PSATG)
9:15 – 10:00 Preservation and Planning (Dr. Dennis Domer)
10:00 – 10:10 10 minute Break
10:00 -- 11:00 The Language of Preservation (Fred Rogers)
11:00 -- 12:00 Procedural Due Process (Glen Payne)
12:00 -- 1:00 Lunch
1:00 -- 2:00 Design Review in Richmond (Glen Payne)
2:00 -- 3:00  Mock Design Review Proceeding (Glen Payne / Ginger Shank)
3:00 – 3:10 10 minute break
3:00 -- 4:00  Ideas, Evaluation, and Wrap-up (PSATG)

 

FILES:

downloadDesign Guidelines for the Richmond H-1 Overlay
(REVISED MARCH 6)

Seminar Agenda [PDF, 12k]

 
downloadDesign Guidelines for the Richmond H-1 Overlay (DRAFT Feb 28)
[PDF, 4MB]
Design Guidelines
Workshop Powerpoint [PDF, 450k] Richmond Design Review Workshop Powerpoint
Anatomy of a Building [PDF, 190k] Anatomy of a Building
LINKS:
Click here to view the Richmond online building inventory.

Richmond Online Building Inventory for the H-1